Hanlin Rainaldi Construction: Website Rebuild and Operating Hub Case Study
Hanlin Rainaldi Construction is a commercial general contractor in Columbus, Ohio, focused on mid-to-large-scale build-outs and QSR restaurant construction. CBus AI Agents set up new hardware for their AI work and built them a 78-page website on a faster platform. Today we work with their leadership on the Operating Hub, an internal operating system meant to replace their project-management platform, and on bringing the team into it by role.
Published April 2026 · Updated October 2026
Working with Columbus AI Agents was an outstanding experience. Jeff helped modernize our company's AI strategy in a way that was practical, customized, and easy to understand. Knowledgeable, responsive, great to work with, and they made what could have been a complicated process feel clear, exciting, and full of opportunity. I would highly recommend them to any business looking to take their AI strategy to the next level.
The situation.
HRC's leadership runs its own AI system day to day and keeps building on it. Our work with them has grown from hardware and search strategy to a rebuilt website and an operating system of their own for project work.
Project information lives in a project-management platform the company pays for every year. Leadership wants a system they control in its place, built so every record lands on the right job and nothing gets lost in the move.
The Operating Hub work starts from what HRC already has. We test each step on the live system before anyone relies on it.
The Operating Hub.
We started with a read-only survey of HRC's existing system, before anyone changed a file. It found them further along than the brief assumed. The plan shifted to connecting real data, bringing the team in, and matching records across systems.
We reviewed all four outside connections and wrote the architecture and the build plan. HRC's leadership writes most of the system. We plan the structure and test their work against the real setup.
Bringing in the team.
The team comes into the system by role. Before anyone joined, we checked the access settings themselves.
Access set by role
Leadership builds the system. The first operators get edit access to the files they own, so the data they keep can move into the system with them. The wider team joins later with read-only access.
A silent permission fault, caught
The setup notes said the operators' group had edit access. The live setting said read. Every person added would have failed to sync their work back, with no error to explain why. We found it by testing the setting itself, fixed it, and verified it again.
Naming the AI's blind spots
We added a section to the team's setup guide that names the systems the AI has no connection to yet, including project records, job costing, and outside spreadsheets. It flags the dashboard figures as a dated snapshot. The rule: if the AI gives a figure nobody can find in the files, don't use it.
A guided first install
We moved the Claude sign-in into the editor the team works in, so a new user opens a command line once, to run the installer. One operator installs first as the pilot, with a 90-minute session plan that covers the five most likely install problems.
What we delivered.
Hardware and AI Setup
Phase one put a new laptop and an external backup drive in place, configured and secured, with the AI tools installed. Standard subcontract templates followed.
Website Rebuild, 78 Pages
A faithful rebuild of the current site on a faster platform, plus a new QSR landing page and a project case study. Same look, same copy, same page addresses, so existing search rankings and inbound links carry over at launch. All 59 project pages carry their real cover photos. Every page has structured data, the site welcomes 15 AI crawlers by name, and an llms.txt file summarizes the business for AI assistants. The contact forms are ready to feed the team's CRM. The site lives in HRC's own accounts with automatic publishing in place. Launch is their call.
Search Visibility and Social Strategy
A full GEO audit of the live site set the baseline. A GEO/SEO strategy, a Google Business Profile cleanup plan, a social media strategy, and a four-week content calendar followed, covering LinkedIn, Facebook, Instagram, Google Business Profile, and email. LinkedIn leads as the B2B channel. The website rebuild carries the structured data and llms.txt fixes the audit called for.
Operating Hub Plan and Team Access
We surveyed the existing system read-only, reviewed its four outside connections, and wrote the architecture and the build plan. For the team, we tested access, added a section to the setup guide, and wrote the pilot install plan.
The status.
We finished the website and handed it off. It's in their hands, and the launch date is theirs to set.
The Operating Hub is in progress. The plan is in place, and the team comes on by role, starting with a pilot install.
Page counts come from the delivered website build. The four outside systems are the connections we reviewed in the Operating Hub survey.
What changed.
Want a system like this
for your business?
We start with a read-only survey of your current setup, before anyone changes a file. Then we build on it with you and test each step before your team relies on it. Book a free call and we will show you where to start.
Book a free call →